Projects
Limited
Credentials
Projects
Limited

Engineering a lasting impression.

Capabilities

Track record is one half of the answer. Capacity is the other.

An evaluation desk that accepts a contractor's completed work still has to satisfy itself that the contractor can carry the next job. These pages set out how KPC builds — the delivery models, the engineering methods, the management systems and the plant we own — with the numbers left in.

Capacity at a glance

Capacity at a glance

50mn

Sq ft of building
projects executed

1,366

Direct employees,
plus 10,000+ indirect

14

States with
delivered projects

64

Line items of owned
plant & machinery

Delivery models

Three ways KPC takes a contract

32 of our 62 recorded projects are live today. The contracting route differs by client and by sector; the site organisation behind it does not.

EPC

Single-point responsibility for engineering, procurement and construction. KPC carries the design, the supply chain and the programme, and the client deals with one contract for the finished asset. Most of our current large-value work — stadium, station redevelopment and highway packages — runs on this basis.

Design & Build turnkey

Concept-to-commissioning delivery including interiors, services and external development. The Gwalior airport terminal was executed this way: a single turnkey scope taken through to a GRIHA 5-star rated, operating passenger terminal.

Civil, structural & MEP

Item-rate and lump-sum civil packages where the client or their consultant holds the design. We self-perform the structure and coordinate the services trades, which is how the majority of our government housing, medical college and hospital work is contracted.

Method

From tender to defects liability

The same six stages run on a 40,000-seat stadium and on a district hospital. What changes is the method chosen at stage one and the plant committed at stage three.

  1. 01

    Tender & method engineering

    Before a bid is priced, the method is chosen: formwork system, crane strategy, batching capacity, and the constraints of the site and the calendar. The estimate is built off that method, not off a rate book.

  2. 02

    Design coordination & BIM

    Architectural, structural and MEP models are federated and clash-checked, and shop drawings are issued from the coordinated model. Services conflicts are resolved on screen rather than in a cast slab.

  3. 03

    Mobilisation

    Plant is drawn from the owned fleet — batching plants, transit mixers, placers, tower cranes, formwork and staging — rather than tendered on the hire market, so mobilisation is a scheduling exercise rather than a procurement risk.

  4. 04

    Execution & quality control

    A site QC laboratory tests concrete, aggregate and steel against the specification, with a calibrated weighbridge on material inflow. Survey control is held by instrument, and every pour is released against a checklist.

  5. 05

    Safety & environment on site

    Site safety runs to a certified occupational health and safety management system: induction, permits for height and hot work, edge protection and inspected access equipment, with environmental controls for dust, waste and water on the same footing.

  6. 06

    Handover & defects liability

    Testing and commissioning, as-built documentation, operation and maintenance manuals and client training, followed by the contracted defects liability period with a retained site team.

Quality, safety & environment

Three certified management systems, audited annually

Quality, environment and occupational health and safety are run as certified management systems rather than as site habits, and they are surveilled by the certifying body on a fixed cycle. Their scope is civil construction for residential and commercial purposes.

Quality

ISO 9001:2015

Documented procedures from tender through handover, with material approvals, pour cards and inspection records held against every element. Testing is done in-house: the fleet carries dedicated quality-control laboratory units and 100-tonne weighbridges on both the buildings and roads divisions, so cube strength, aggregate grading and consignment weights are verified on site rather than taken on trust.

Occupational health & safety

ISO 45001:2018

Hazard identification and risk assessment before each activity, permit-to-work for height, lifting and hot work, inspected access equipment, and induction for every worker including sub-contracted labour. KPC's safety performance has been recognised by the British Safety Council and by a World Safety Organisation excellence award for the IIPE Visakhapatnam project.

Environment

ISO 14001:2015

Dust, noise, waste segregation and water management controlled to a site environmental plan, with prefabrication used to move waste-generating work off site. Two completed buildings carry green ratings — the Gwalior airport terminal at GRIHA 5-star and the IRDA office complex at GRIHA 3-star — and the KPC ONE corporate office is IGBC rated.

Certifications and green ratings held by KPC Projects Limited
CertificationIssued byScope
ISO 9001:2015 — Quality Management SystemProviding civil constructions for residential and commercial purpose
ISO 14001:2015 — Environmental Management SystemProviding civil constructions for residential and commercial purpose
ISO 45001:2018 — Occupational Health & Safety Management SystemProviding civil constructions for residential and commercial purpose
GRIHA 5-StarGRIHA CouncilGwalior Airport new terminal building, Madhya Pradesh
GRIHA 3-StarGRIHA CouncilIRDA Office Complex, Hyderabad
IGBC Green Building RatingIndian Green Building CouncilKPC ONE, Punjagutta, Hyderabad — the corporate office

Certificate numbers, issue and expiry dates →

Evaluating KPC for a tender?

The pre-qualification pack collects the statutory documents, certifications, completed-project values and the plant schedule in one place. For anything it does not answer, the tender desk replies directly.